PDF(66.6 KB) View with Adobe Reader on a variety of devices
Updated:January 29, 2010
Document ID:1518450199784922
Bias-Free Language
The documentation set for this product strives to use bias-free language. For the purposes of this documentation set, bias-free is defined as language that does not imply discrimination based on age, disability, gender, racial identity, ethnic identity, sexual orientation, socioeconomic status, and intersectionality. Exceptions may be present in the documentation due to language that is hardcoded in the user interfaces of the product software, language used based on RFP documentation, or language that is used by a referenced third-party product. Learn more about how Cisco is using Inclusive Language.
EOL6870
Cisco announces the end-of-sale and end-of life dates for the Cisco Catalyst 4500 Auxiliary Power Shelf. The last day to order the affected product(s) is July 31, 2010. Customers with active service contracts will continue to receive support from the Cisco Technical Assistance Center (TAC) as shown in Table 1 of the EoL bulletin. Table 1 describes the end-of-life milestones, definitions, and dates for the affected product(s). Table 2 lists the product part numbers affected by this announcement. For customers with active and paid service and support contracts, support will be available until the termination date of the contract, even if this date exceeds the Last Date of Support shown in Table 1.
Table 1. End-of-Life Milestones and Dates for the Cisco Catalyst 4500 Auxiliary Power Shelf
Milestone
Definition
Date
End-of-Life Announcement Date
The date the document that announces the end of sale and end of life of a product is distributed to the general public.
January 30, 2010
End-of-Sale Date
The last date to order the product through Cisco point-of-sale mechanisms. The product is no longer for sale after this date.
July 31, 2010
Last Ship Date: HW
The last-possible ship date that can be requested of Cisco and/or its contract manufacturers. Actual ship date is dependent on lead time.
October 29, 2010
End of SW Maintenance Releases Date: HW
The last date that Cisco Engineering may release any final software maintenance releases or bug fixes. After this date, Cisco Engineering will no longer develop, repair, maintain, or test the product software.
July 31, 2011
End of Routine Failure Analysis Date: HW
The last-possible date a routine failure analysis may be performed to determine the cause of product failure or defect.
July 31, 2011
End of New Service Attachment Date: HW
For equipment and software that is not covered by a service-and-support contract, this is the last date to order a new service-and-support contract or add the equipment and/or software to an existing service-and-support contract.
July 31, 2011
End of Service Contract Renewal Date: HW
The last date to extend or renew a service contract for the product.
October 26, 2014
Last Date of Support: HW
The last date to receive service and support for the product. After this date, all support services for the product are unavailable, and the product becomes obsolete.
July 31, 2015
HW = Hardware OS SW = Operating System Software App. SW = Application Software
Table 2. Product Part Numbers Affected by This Announcement
End-of-Sale Product Part Number
Product Description
Replacement Product Part Number
Replacement Product Description
Additional Information
PWR-4502
Catalyst 4500 Aux. Power Shelf Redundant Power Supply
PWR-C45-6000ACV
Catalyst 4500 6000W AC dual input Power Supply (Data + PoE)
--
PWR-4502=
Catalyst 4500 Aux. Power Shelf Redundant Power Supply
PWR-C45-6000ACV
Catalyst 4500 6000W AC dual input Power Supply (Data + PoE)
--
WS-P4502-1PSU
Catalyst 4500 Aux. Power Shelf (2 slot), incl. one PWR-4502
PWR-C45-6000ACV
Catalyst 4500 6000W AC dual input Power Supply (Data + PoE)
Customers can use the Cisco Technology Migration Program (TMP) to trade-in products and receive credit toward the purchase of new Cisco equipment. For more information about Cisco TMP, customers should work with their Cisco Partner or Cisco account team. Cisco Partners can find additional TMP information on Partner Central at
http://www.cisco.com/web/partners/pr11/incentive/tmp/index.html
Customers may be able to continue to purchase the Cisco Catalyst 4500 Auxiliary Power Shelf through the Cisco Certified Refurbished Equipment program. Refurbished units may be available in limited supply for sale in certain countries on a first-come, first-served basis until the Last Date of Support has been reached. For information about the Cisco Certified Refurbished Equipment program, go to: www.cisco.com/go/eos
Service prices for Cisco products are subject to change after the product End of Sale date.
The Cisco Takeback and Recycle program helps businesses dispose properly of surplus products that have reached their end of useful life. The program is open to all business users of Cisco equipment and its associated brands and subsidiaries. For more information, go to:
http://www.cisco.com/web/about/ac227/ac228/ac231/about_cisco_takeback_recycling.html